Download Print this page

Plymouth Valiant V-100 1965 Service – Technical Manual page 286

Advertisement

ENGlN EE-8-CY UNDER
9-29
(3) Remove transmission jack.
(4) Install the rear engine mount to transmission
(5)
Lower the vehicle.
bolts and tighten to 35 foot-pounds torque.
ENGINE ASSEMBLY
Removal
(1) Scribe the outline of the hinge brackets on the
hood to assure proper adjustment when installing. Re-
move the hood.
(2) Drain the cooling system and remove the bat-
tery.
(3) Remove all hoses, fan shroud (or air condi-
tioned vehicles), oil cooler lines and radiator.
(4)
Disconnect the fuel lines, linkage and wires at-
tached to engine units and remove the air cleaner and
carburetor.
( 5 )
Attach the engine lifting fixture Tool (2-3466
to the carburetor flange studs on the intake manifold.
(6)
Raise the vehicle on a hoist and install the en-
gine support fixture Tool (2-3487 on the chassis to s u p
port the rear of the engine.
(7) Drain the transmission.
(8) Disconnect the exhaust pipes at the manifolds,
propeller shaft, wires linkage, speedometer cable,
and the oil cooler lines at the transmission.
(9) Remove the engine rear support crossmember
and remove the transmission from the vehicle.
(10) Lower the vehicle and attach a crane
or
other
suitable lifting tool to the fixture eyebolt.
(11) Remove the engine front mounts. Raise the en-
gine with lifting tool and work engine out of the chas-
sis.
(12) Place the engine in repair stand C-3167 and
adapter C-3662 for disassembly using transmission
mounting bolts.
Installation
(1) Attaching the engine lifting fixture Tool C-3466
to the carburetor flange studs
on
intake manifold.
(2)
Attach a crane or other suitable lifting tool to
the fixture eyebolt.
(3)
Remove the engine from the repair stand and
lower the engine carefully until the engine is posi-
tioned in the chassis with front engine mounts in
place.
(4) Install the engine support fixture Tool C-3487
on the chassis to support the rear of the engine. Re-
move the crane.
(5) Raise the vehicle on a hoist, install the trans-
mission, engine rear support crossmember, tighten
front engine mounts, remove the engine support fix-
ture, Tool C-3487.
(6) Connect the propeller shaft, wires, linkage,
speedometer cable, oil cooler lines at the transmis-
sion, connect exhaust pipes to manifolds. Install the
transmission filler tube.
(7) Lower the vehicle and remove the engine lift-
ing fixture Tool C-3466 from the engine. Install the
carburetor and fuel lines.
(8) Install the radiator, fan shroud, hoses, oil cooler
lines and connect all wires and linkage.
(9) Install the hood using scribe marks for the prop-
er alignment.
(10) Close all the drain cocks and fill cooling sys-
tem, install battery.
(11) Fill the engine crankcase and transmission. Re-
fer to "Lubrication" Group 0, for quantities and lu-
bricants to use. Inspect the entire system for leaks
and correct as necessary.
NOTE: Whenever an engine has been rebuilt
and/or a new camshaft and/or new tappets have
been installed, add one quart of MoPar Engine
Supplement Part Number 1879406 to engine oil to
aid break-in. The oil mixture should be left in en-
gine for a minimum of
500
miles, and drained at
the next normal oil change.
(12) Start the engine and run until normal opera-
ting temperature is reached.
(13) On
273 and 318 Cubic inch engines
only ad-
just the tappets.
(14) Test the timing (with vacuum advance line
removed) and adjust carburetor and transmission link-
age as necessary. Connect vacuum lines, install air
cleaner and road test the vehicle.
ROCKER ARMS AND SHAFT
Removal
1378
Cubic Inch EngineJ
For cleaning, inspection or installation of new
parts, remove the cylinder heads from the engine on
318 Cubic Inch Engines. Refer to Cylinder Head As-
EXHAUST VALVE
ROCKER ARMS
INTAKE ROCKER ARMS
NK1037
Fig. 62-Rocker
Shaft
Assembly
(318 Cubic InchJ

Hide quick links:

Advertisement

loading