Download Print this page

Plymouth Valiant V-100 1965 Service – Technical Manual page 653

Advertisement

CONVERTIBLE MAINTENANCE
23-83
(11) Position the drain hose in the floor pan plug
and install on the liner connector.
(12) Position the top cover and rear curtain ends
to the alignment marks and install the retaining
screws.
(13) Install the moulding retainers and mouldings.
(14) Adjust the tension cables and install the well
(15) Remove the masking tape and protective cov-
flap retainers (Fig. 181).
ers.
ROOF SIDE RAIL
W EATH ERSTRl P ADJUSTMENT
After the roof side rails have been aligned, inspect
the side rail weatherstrip (Fig. 182) to make
sure it
is providing a good seal at the top of the door and
quarter glass.
If the weatherstrip is not sealing properly, the re-
tainer and weatherstrip can be adjusted to improve
the seal. The retainer has elongated attaching screw
holes which permit the retainer and weatherstrip to
be moved in or out.
To adjust the seal fit along the edge of the glass,
loosen the retainer screws under the weatherstrip and
adjust the retainer, as required.
Raise the glass until the top edge of the glass curls
the outer lip of the weatherstrip inward just enough
to contact the inner lip. Adjust the up-stops to limit
further upward travel of the glass.
TOP MATERIAL
WINDSHIELD HEADER
WINDSHIELD UPPER
\
MOULDING
CORNER FRAME
- 1
k
6 INCHES
VIEW IN DIRECTION
OF ARROW
X
UPPER FRONT PILLAR
HEADER WEATHERSTRIP
N K969
YlEW IN DIRECTION OF ARROW
Z
VIEW IN DIRECTION OF ARROW V
Fig. 184-Folding
Top-Lock
Pilla+Seals
and
Sealers

Hide quick links:

Advertisement

loading