Download Print this page

Plymouth Valiant V-100 1965 Service – Technical Manual page 328

Advertisement

13-2
FRAME
NK140
Fig. 3-Frame
Diagonal Measurements
FRAME REPLAC E M EN1
Removal
(1) Drain the radiator and remove the battery.
(2) Remove the front bumper and the hood assem-
bly.
(3) Disconnect the radiator hoses from the radiator,
the heater hoses, the head lamp wires and the horn
wires.
(4)
Remove the hood hinge to the fender mounting
screws (one each side).
(5)
Remove the upper and lower nuts and studs at-
taching the fender to the wheelhouse (Fig.
4).
(6)
Remove the bolts attaching the splash shields to
the cowl.
(7)
Remove the splash shield to body frame bolts,
(Fig.
5),
and the splash shield to stub frame bolts.
(8)
Remove the fender to body sill bolts and the
Fig. 4-Fender
to
Wheel House Mounting
r
Fig. 5-Splash
Shield to Body Frame Mounting
fender to body post bolts.
metal to the stub frame yokes (Fig.
6).
(9) Remove the bolts attaching the front end sheet
(10) Disconnect the radiator yoke from the frame.
(11) Raise the fenders off of the mounting studs at
the cowl and remove all front end sheet metal and
radiator as an assembly. With all front end sheet
metal removed, raise the vehicle on a hoist.
(12) Disconnect the propeller shaft and the trans-
mission shift cable from the transmission. Disconnect
the exhaust pipe at the front of the muffler. Discon-
nect the parking brake cable.
(13) Remove the jacket tube clamp at the instru-
ment panel.
(14)
Disconnect the steering gear tube at the lower
Fig. &Radiator
Support to Frame Yoke Mounting

Hide quick links:

Advertisement

loading