Chrysler Conquest 1988 Service Manual page 757

Engine, chassis, body. volume-1
Hide thumbs Also See for Conquest 1988:
Table of Contents

Advertisement

Piston ring
6EN03:
-
ENGINE
- Piston
and Connecting
Rod
9-57
(3) Insert a piston ring into cylind&
bore..Correctly
position
the
ring at right angles to the cylinder wall by gently pressing
it
down
with
a piston.
Draw the piston
up and out, then measure
the gap with a
feeler gauge.
If the gap exceeds
the limit, replace the piston
ring.
Piston
ring
end
gap:
Standard
value
No. 1
0.30-0.45
mm
(.0118-
.0177 in.)
No. 2
0.25 - 0.40
mm
I.0098
-
.0157 in.)
Oil ring
0.30-0.80
mm (.0118-
.0315 in.)
IJmit
No. I'
0.8 mm (.031 in.)
No. 2
0.8 mm (.031 in.)
Oil
ring
1.0 mm (.039 in.)
r
BEARING
NOSTCDA
(1) Visually check the bearing
surface and replace the bearing if
'
there
is uneven
contact,
streak,
scratch or burn. If there
is
heavy streak
or burn, also check the crankshaft.
Replace
the crankshaft
or machine
it to an undersize
if damaged.
(2) Measure
the connecting
rod bearing
I.D. and crankshaft
pin
O.D. and if the clearance
exceeds
the limit, replace
the
bearing
and, if necessary,
also replace
the crankshaft,
Or
machine
the crankshaft
to an undersize
and replace
the
bearing
with
an undersized
one.
Standard
value:
0.019
- 0.056
mm
I.0007
- .0022
in.)
Limit:
0.1 mm
(.004
in.)
NOTE
Refer to CRANKSHAFT
for measurement
of oil clearance
with
plastic-gauge.
SERVICE
POINTS
OF INSTALLATION
9.
INSTALLATION
OF OIL RING
NO9TDAC
(1) First, install the oil ring spacer in the piston ring groove.
Next, install the upper side rail and then the lower side
rail.
Both upper
and lower side rails may be installed
with
their
either
side facing
up.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents