Chrysler Conquest 1988 Service Manual page 440

Engine, chassis, body. volume-1
Hide thumbs Also See for Conquest 1988:
Table of Contents

Advertisement

. .._
--~-
E
s
LIGHTING
SYSTEM
- Service Adjustment
Procedures
gg-
-i
at front tire
1. Calibration
fixture
2. Thumb adjusting
screws
3. Level vial
4. Floor level offset dial
5. Horizontal
dial knob
6. Vertical dial knob
7. Aimer level vlal
8. LevelviaLbubble
9. Top port hole
10. Vlewing
port
16C782
li!c!cl
m
Split image
Split image
not aligned
aligned
@jy-J-J
q-?$yjy)
Bubble not centered
Bubble centered
16Y 8%
Glass window or
~~~~~ viai smooth surface
Almer level vial
13 to 5 feet) apart,
Unit A
16C79(
SERVICE ADJUSTMENT
PROCEDURES
s
NOBIIAA
=
HEADLIGHT
AIMING
=z E
PRE-AIMING
INSTRUCTIONS
s
1.
2.
3.
4.
5.
6.
7.
8.
9.
IO
Test dimmer
switch
operation.
Observe
opet%tion
of high beam
light mounted
fin instru-
.-
ment
cluster.
Inspect
for badly
rusted
% faulty
headlight
assemblies.
i
These
conditions
must
be--corrected
before
a sa@sfact&?y
T
adjustment
an
be made-
Place vehicle
on a level floor.
Bounce
front suspension
through
three
(31 pscill&ions
by -~~
applying
body weight
to hood
or bumper;
Inspect
tire inflation.
r
Rock
vehicle
sideways
to allow
vehicle
to assume
~?tTts 7
normal
position.
If fuel tank Knot
full, place a weight
in trunk of vehicle
to
-1
simulate
weight
of a full Tank [3 kg (6.5 Ibs.) per gallon].
~-
There
should
be no other
load in the vehicle
other
than -2
driver or substituted
weight
of approximately
70 kg (l%O
:
Ibs.) placed
in driver's
position.
Thoroughly
clean headlight
lenses.
CiJMPENSATlNG
THE
AIMERS
(C-4466)
FOR
FLOOR
SLOPE
The floor level offset
dial must coincide
with the floor slope-for
I
accurate
aiming.-
Calibration
.fixtures
are included~~~ with
the .L
aimers.
1. Attach
one calibration
fixture
to each aimer.
Fixtures
&ill y:
easily snap into position
on aimer when properly
pXtioned.
/
2.
Place aimerz
at center
line of each wheel
on one side of
-
vehicle.
Unit-A
must
be placed
at-rear
wheel
v$th target
1:
facing forward.
Unit B must be placed at front wheel
with
z
target
facing_ rearward.
3.
Adjust thumb
adjusting
screw on each calibi%tioKfixture
by ~=
turning
either clockwise
OCR counterclockwise
unc$ level vial-
bubble
registers
in
a ce_nrered,
level position.
m_
'
-'
4.
Look Into top port hole of Unit A. Turn horizontal
knob until--
split Image
IS aligned.
5. Transfer
plus or minus reading indicated
on horizontal
dial to
floor level offset
dial on each aimer.
Press floor level dials -=
inward
to .set reading.
z
6.
Remove
calibration
fixtures
from
both
un!ts.
TESTING
AIMER
CALIBRATION
The
aimer
calibration
may- be off
due
to
extended
-use>
Calibration
fixtures
used
in conjunction
with
aimers
cati beg,
used to check
and adjust
&me%-
-_-
1. Turn thumb
adjusting
screw on each calibration
fixtureluntiJ
1
it is approximately
the same
distance
as the suppot-trnc<~
posts.
2. Attach
calibration
fixtures
to each unit with
level via;; 00:;
top.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents