AUTOMATIC
TRANSMISSION
- Transmission
Oil Cooler
21-75
TRANSMISSION
OIL COOLER
REMOVAL AND INSTALLATION
NZlSA- -
(Refer to GROUP $ LUBRICATION
AND MAINTENANCE
-
1. Eye
bolts
2. Gasket
3. Oil return tube
4. Oil feed tube
5. Oil return hose
6. Oil feed hose
7. Oil return tube
8. Oil feed tube
9. Oil return
hose
10.
Oil feed hose
11. Oilcooler assembly
NOTE
4*: Refer to "Service
Points of Removal"
Post-installation
Operation
l
Installation
of Air Guide Panel
#
l
RefWng with Automatic
Transmlsslon
Fluid
(Refer to GROUP 0 LUBRICATION
AND MAINTENANCE
-
04Y669
22-36
Nm
ft.lbs.