Chrysler Conquest 1988 Service Manual page 365

Engine, chassis, body. volume-1
Hide thumbs Also See for Conquest 1988:
Table of Contents

Advertisement

CHARGING
SYSTEM
-
Service
Adjustment
Procedures
8-115
REGULATED
VOLTAGE
TEST
The purpose
of this test is to check that the electronic
voltage
regulator
controls
the voltage
correctly.
Preparation
(1) Prior to the test,
check the following
items and correct
if
necessary.
(a) Check the battery
installed
on the vehicle to see that it
is fully charged.
For battery
checking
method,
see
"BATTERY".
(b) Check the alternator
drive belt tension.
For belt tension
check,
see "GROUP
7 COOLING".
(2) Turn the ignition
switch
to "OFF".
(3) Disconnect
the battery
ground
cable.
(4) Connect
a digital voltmeter
between
the "S" terminal
of the
L
alternator
and ground.
Connect
the (+) lead of the volt-
meter
to the "S" terminal
of the alternator,
inserting
from
the wire side of the 2-way connector
and connect
the (--)
lead to sound
ground
or battery
(-) terminal.
r
Ignition
-. . .:+,.C.
Alternator
) qyfl-
?ter
/Voltmeter
-
I Ammo
Battery
-w
Load
6EL252

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents