Nortel North American DMS-100 Instruction Manual page 389

Table of Contents

Advertisement

1-374 Trouble locating and clearing procedures (continued)
Scheduling an automatic REx test
10
11
297-8021-544 Standard 14.02 May 2001
To include the posted LIM in the REx test schedule, type
>REX ON
and press Enter.
Example of a MAP response:
LIM x UNIT y has been included in the REX Schedule.
The procedure is complete.
(end)

Advertisement

Table of Contents
loading

Table of Contents