Figure 376:
Autoreclosing sequence with two shots
t
Time delay of high-speed autoreclosing, here:
HSAR
t
Time delay of delayed autoreclosing, here:
DAR
t
Operating time for the protection stage to clear the fault
Protection
t
Operating time for opening the circuit breaker
CB_O
t
Operating time for closing the circuit breaker
CB_C
In this case, the sequence needs two CBBs. The reclosing times for shot 1 and shot 2 are
different, but each protection function initiates the same sequence. The CBB sequence is
described in Table
537
as follows:
GUID-A9DFEA78-6500-46BA-96A4-8A39966BE0B0 V1 EN
Figure 377:
Two shots with three initiation lines
Section 9
Control functions
First reclose time
Second reclose time
739