51P/50P is used in several applications in the power system. The applications include but
are not limited to:
Selective overcurrent and short-circuit protection of feeders in distribution and
subtransmission systems
Backup overcurrent and short-circuit protection of power transformers and
generators
Overcurrent and short-circuit protection of various devices connected to the power
system, for example shunt capacitor banks, shunt reactors and motors
General backup protection
51P/50P is used for single-phase, two-phase and three-phase non-directional overcurrent
and short-circuit protection. Typically, overcurrent protection is used for clearing two and
three-phase short circuits. Therefore, the user can choose how many phases, at minimum,
must have currents above the pickup level for the function to trip. When the number of
pickup-phase settings is set to "1 out of 3", the operation of 51P/50P is enabled with the
presence of high current in one-phase.
When the setting is "2 out of 3" or "3 out of 3", single-phase faults are not
detected. The setting "3 out of 3" requires the fault to be present in all three
phases.
Low PHLPTOC
High PHHPTOC
Instantaneous PHIPTOC
PHLPTOC is used for overcurrent protection. The function contains several types of time-
delay characteristics. PHHPTOC and PHIPTOC are used for fast clearance of very high
overcurrent situations.
Many applications require several steps using different current pickup levels and time
delays. 51P/50P consists of three protection stages:
Low 51P
High 50P-1/2
Instantaneous 50P-3
51P is used for overcurrent protection. The function contains several types of time-delay
characteristics. 50P-1/2 and 50P-3 are used for fast clearance of very high overcurrent
situations.