8.4.7

Testing of the intelligent function module

When testing the operation (changing a current buffer memory value) of the intelligent module monitor, read this
manual carefully to fully understand the operation.
For devices that perform significant operations for the system, never perform test operation to change data.
Doing so can cause accidents due to false outputs or malfunctions.
Testing can be performed for all buffer memory data displayed on the current monitor screen.
This section describes the operations for changing the current value of the buffer memory and turning on and off the output
signal from the PLC CPU to the intelligent function module.
POINT
POINT
POINT
(1) PLC signals used for the test
(2) Status of the PLC CPU for the test
Step 1.
Display monitor screen.
Step 2.
Touch the [Data Chg.] or [SET/RESET] key.
Step 3.
Display key window on monitor screen.
• When [Data Chg.] is touched (changes current value of buffer memory)
All of the following operations can be carried out by touching the keys in the displayed key window.
When you touch [×] key at the upper left of the key window, the key window closes and the display returns
to the monitor screen.
WARNING
Perform testing for the buffer memory that can be written from the PLC CPU and output
signals that are output from the PLC CPU.
It is recommended that testing be performed with the PLC CPU in STOP status.
If the PLC CPU is tested during RUN status, the test monitor display returns to display values
output from the sequence program and output statuses.
8.4 Operation of Each Intelligent Module Monitor Screen
8
8 - 33