Mitsubishi Electric GOT2000 Series User Manual page 135

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(3) Remote operation window
Changing the operation status of the PLC CPU by using the remote operation is available.
(a)
Displayed screen
The following table shows the displayed contents.
No.
1)
Operation
2)
STOP → RUN operation
3)
1)
2)
Item
Select an operation (RUN or STOP key), and touch the [Execute] key.
• RUN: The PLC CPU becomes the remote RUN status.
• STOP: The PLC CPU becomes the remote STOP status.
Set the status of devices and signals when executing the remote RUN.
Device memory
• Do not clear: The PLC CPU operates device values prior to the remote STOP.
• Clear all except latch: Clears all device values to zero except the latched
devices.
• Clear all: Clears all device values to zero.
Signal flow
• Save: Keeps signals prior to the remote STOP, and outputs the signals.
• Turn OFF: Turns off the signal.
• Turn ON: Turns on the signal.
[Execute]
Executes the remote RUN or STOP.
3)
Description
4.7 How to Operate Ladder Editor Screen
4
4 - 47

Advertisement

Table of Contents
loading

Table of Contents