Mitsubishi Electric GOT2000 Series User Manual page 567

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Step 3.
Set the channel number.
Set the channel number of the CNC connected to the GOT.
If [×] is touched to close the communication setting window without setting a channel number, the channel
number is set to [1].
After the GOT is powered on, the communication setting window is displayed only at the first startup of the
CNC machining program edit.
For displaying the communication setting window at the second or later startup, touch the [Ch:] key on the
CNC machining program edit screen.
19.4 Operation Procedures
Step 4.
The CNC machining program edit starts after the channel number is selected.
■2. Start operation using the special function switch
The CNC machining program edit can be started using special function switches.
If a special function switch with the following settings is touched, the CNC machining program edit screen of the set
controller can be displayed.
• Selecting [CNC Manufacturing Program Editor] in [Switch Action], and checking [Specify the destination to connect
the screen of CNC Manufacturing Program Editor]
For Q buss connection, input 2 or larger for [CPU No.] in [Network].
Operation at start differs depending on the setting contents of the special function switch.
For the setting items for the special function switch, refer to the following.
GT Designer3 (GOT2000) Screen Design Manual
19.3 Operations for Display
19
19 - 3

Advertisement

Table of Contents
loading

Table of Contents