Power; Figure 4-15 Power Down Initiation Screen - Overland Storage Neo Series Library Service Manual

P/n 104241-xxx
Table of Contents

Advertisement

L
D
S
O
IBRARY
ISPLAY
CREENS AND
PTIONS

Power

Selecting this option initiates a library power-down operation
4-12
Operation
u
NOTE: The library moves the shuttle assembly to the parked position before powering down.
Figure 4–15. Power Down Initiation Screen
(Figure
4–15).

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Neo Series Library and is the answer not in the manual?

This manual is also suitable for:

Neo series 2000Neo series 4000

Table of Contents