Figure 3-69 Applying Power - Overland Storage Neo Series Library Service Manual

P/n 104241-xxx
Table of Contents

Advertisement

S
A
T
S
HUTTLE
SSEMBLY
RACK
ENSOR
3-74
Servicing the Neo Series 4000
u
R
R
EMOVE AND
EPLACE
5) Replace the Tabletop Cover and Front Chassis Cover using
Replace"
instructions in this chapter.
6) Turn on the library module as follows, see
a. Connect the power cords to the power supply's receptacle (1).
b. Toggle the power switches located on the power supply to ON (2).
c. Press anywhere on the GUI touch screen to apply power to the module (3).
7) Verify normal initialization with no fault messages.
2
Figure
1
Figure 3–69. Applying Power
"Library Covers Remove and
3–69.
3

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Neo Series Library and is the answer not in the manual?

This manual is also suitable for:

Neo series 2000Neo series 4000

Table of Contents