A
P
LIGNMENT
ROCEDURE
B-4
u
1 4
Figure B–6. Mounting Screw Sequence
8) Torque tighten the 4 mounting screws of each screw rail in the sequence shown in
9) Press "Final Calibration" from the Vertical Axis Calibration screen,
NOTE: Upon pressing Final Calibration, the library will run for ten cycles and the Upward and
Downward windows will display demand results as each cycle is completed. At the
completion of the first phase of the test, the Front and Rear Motor Demand windows will
display demand averages and the Final Calibration GUI button will change back to Initial
Calibration,
Figure B–8
2
3
.
4
2
1
3
Neo-7001e
Figure
Figure
B–7.
B–6.
Need help?
Do you have a question about the Neo Series Library and is the answer not in the manual?