Figure 3-14 Powering Up The Library - Overland Storage Neo Series Library Service Manual

P/n 104241-xxx
Table of Contents

Advertisement

F
P
LED R
R
RONT
ANEL
EMOVE AND
3-16
Servicing the Neo Series 4000
u
EPLACE
4) Replace the two mounting screws.
5) Replace the GUI Assembly as described in
6) Replace the Front Panel as described in
7) Turn on the library module, see
1
a. Connect the power cords to the power supply's receptacle (1).
b. Toggle the power switches located on the power supply to ON (2).
c. Press anywhere on the GUI touch screen to apply power to the module (3).
"GUI Assembly Remove and
"Front Panel Remove and Replace"
Figure
3–14.
2
3
Figure 3–14. Powering up the Library
Replace".
Neo-0004

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Neo Series Library and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Neo series 2000Neo series 4000

Table of Contents