Cabling and Interface Connections
Before the Neo Series with the Elevator Assembly can communicate with the host device or user
applications, the following cable connections must be made, see
used for illustration purposes. The second module (Slave 0) has been selected as the Secondary Master
1) Verify that the modules and router have been properly installed in the rack. Power down all the
modules and the router.
TO HOST
MASTER TO
Elevator
Elevator
to SECONDARY
MASTER
2) Install terminator on Master Library Controller Card connection.
3) Optional: With power removed from both the router and the Neo modules, connect the WAN
point to the host with a 10BaseT cable, see
applicable to systems that utilize a Host. (For WEB TLC operations)
4) Using10BaseT cable, connect cable from Router port 1 to the top Neo Series module (Primary
Master), see
Figure C–2
5) Connect cable from Router port 2 to the second Neo Series module in the stack (Secondary
Master).
1
2
3
4
Figure C–33. Typical Library Cabling
Figure C–2
and
Figure
C–33.
C
I
ABLING AND
NTERFACE
Figure
C–33. A four module Library is
5
6
7 WAN
LIBRARY
CONTROLLER
CARD
TERMINATOR
CONNECTION
10BaseT
CONNECTION
Neo-0015
and
Figure
C–33. This step is
C
ONNECTIONS
C-27
t
Need help?
Do you have a question about the Neo Series Library and is the answer not in the manual?