Rep 3.10 Power Distribution Pwb - Xerox ColorQube 9303 Series Service Manual

Table of Contents

Advertisement

Replacement
Do not use a NVM module PWB that has previously been in another machine as it will transfer
the machine serial number and speed to the new machine. Destroy used NVM modules.
1.
If necessary, install the new battery onto the NVM module PWB. Check the battery is
located correctly,
GP
45.
2.
Install the NVM module PWB. Make sure the NVM module PWB is fully seated.
When installing the PWB cover,
PL 3.11 Item
disk drive/single board controller PWB harness is not unlatched.
3.
Install the PWB Cover,
PL 3.11 Item
4.
Install the harness guide plate,
PL 3.11 Item
5.
At power up a 'configuration parameter' error will appear as the machine does not know
what the serial number is. Enter the serial number from the machines frame serial number
plate, dC132. Type carefully and double check that the entered number is correct.
NOTE: An incorrect entry can only be rectified with another new NVM module PWB.
6.
The machine will then retrieve the machine speed from the SIM. If the data cannot be
retrieved from the SIM or the SIM is not present, the machine will default to 9301. Enter
dC131
NVM Read / Write location 616-003. Check that the machine speed is correct. If
the setting is wrong, escalate through the normal channels to have a pre-serialized SIM
sent to you.
7.
Check with the customer that the billing plan and service plan are correct. If the customer
has changed either since the machine was purchased these will not be reflected. Use
dC103
billing plan and
dC136
service plan to correct as necessary.
8.
Open / Close all paper trays and confirm the media in each tray.
9.
Enter Service Copy Mode
(GP
1). Perform the following:
Select Machine Info / Tools / Device Settings / Paper Management / Paper Size Pref-
erences. Set to inches or metric as necessary.
(XE Only) Check the tray 3 media setting. Select Machine Info / Tools / Device Set-
ting / Paper Management / Tray contents. Set to A4 or 8.5 x 11 as necessary.
10. Set the correct market region, dC134.
11. If a new NVM module PWB has been installed, perform an Altboot,
NOTE: The Altboot is not required if only a new battery has been installed.
12. Perform the following:
dC608
Document Feeder Registration.
dC609
Document Glass Registration.
NVM restore,
dC361
NVM Save and Restore.
NOTE: Using
dC131
to make changes to the NVM settings will result in the values being over
written during the next power cycle. Use only the diagnostics routines listed.
Repairs/Adjustments
REP 3.9, REP 3.10
CAUTION
CAUTION
11, ensure that the PJ222 connector for the hard
11.
24.
GP
4.

REP 3.10 Power Distribution PWB

Parts List on
PL 3.11
Removal
Switch off the electricity to the machine. Refer to
from the customer supply while performing tasks that do not need electricity. Electricity
can cause death or injury. Moving parts can cause injury.
Ensure that ESD procedures are observed during the removal and installation of the power dis-
tributionPWB.
1.
Remove the PWB cover,
2.
Disconnect all connectors on the power distribution PWB.
February 2013
4-34
WARNING
GP
14. Disconnect the power cord
Figure 1 ESD Symbol
CAUTION
PL 3.11 Item
11.
ColorQube® 9303 Family

Advertisement

Table of Contents
loading

Table of Contents