Xerox ColorQube 9303 Series Service Manual page 1119

Table of Contents

Advertisement

If the marking unit has not been removed. Take care not to contact the printheads with the
drum during removal.
19. Remove drum and front drum frame assembly,
3
2
Remove the drum and
Hold front assembly
front drum frame assem-
with left hand.
bly by pulling them away
from the rear assembly.
Figure 3 Removal
ColorQube® 9303 Family
CAUTION
Figure
3.
1
Support the rear
underside of the
drum with right
hand through the
opening.
20. Release the drum from the front drum frame assembly,
NOTE: Use the top section of the replacement drum packaging to support the old drum.
This will help to keep the drum stable during the separation.
1
Remove 3 screws.
Replacement
Replacement is the reverse of the removal procedure. Observe the following points at the
appropriate steps.
NOTE: High pressure bearing grease,
Drum bearing housing in the front drum frame casting.
Drum pulley bearing housing in the rear drum frame casting.
Outside diameter of the transfix roller bearing holder at the front of the transfix roller.
During normal removal and replacement the existing bearing grease used during manufacture
will be sufficient. Only apply grease when both sides of any bearing surface are being
replaced, or if the surfaces have been wiped clean. Apply the grease very sparingly.
1.
A replacement drum will have a drum protector and drum alignment tool supplied with the
drum. Install these items onto the drum before installing the drum.
2.
Attach the drum to the front drum frame assembly.
February 2013
4-361
Figure
4.
2
Separate the drum and front
drum frame assembly.
Figure 4 Release the drum
PL 26.11 Item
3, is used in the following locations.
Repairs/Adjustments
REP 91.25

Advertisement

Table of Contents
loading

Table of Contents