Belarus 80.1 Operation Manual page 241

Hide thumbs Also See for 80.1:
Table of Contents

Advertisement

To set a required track, do the following:
- brake the tractor using the parking brake. Put wheel chocks at the front and back
of rear wheels;
- jack up the tractor front part (or front wheels one by one), ensuring clearance be-
tween the wheels and the ground;
- to obtain the track by displacing the wheel from one sideboard to the other one
without changing plate position in relation to the rim, unscrew the nuts fastening the wheel
plate to the gear group flange, take the wheels off and change from one sideboard to the
other one,
- to obtain the track by changing plate position in relation to the rim with the wheels
taken off the tractor, unscrew the nuts fastening the wheel rim to the plate, and depending
on the track required, set mutual arrangement of the rim and the plate as shown in the di-
agram in table 4.2.8.
- when mounting the wheels make sure the wheel rotation direction at forward
movement coincides with the direction of an arrow on tyre sidewall.
The tightening torque for the nuts attaching plates to the gear group flanges shall make
200 to 250 Nꞏm;
The tightening torque for the plates' nuts to the rim brackets shall make 180 to 240
Nꞏm.
ATTENTION: AFTER MOUNTING THE WHEELS, CHECK THE NUTS FOR
TIGHTENING AFTER THE FIRST OPERATION HOUR, AFTER 10 OPERATION HOURS
AND EVERY SUBSEQUENT 125 HOURS OF OPERATION!
ATTENTION: AFTER CHANGING THE FRONT WHEEL TRACK WIDTH, CARRY
OUT CHECK AND ADJUSTMENT OF FRONT WHEEL TOE-IN. BEFORE CHECKING
TOE-IN, CHECK AND, IF NECESSARY, ADJUST THE GAPS IN STEERING JOINTS!
241
80-0000010B OM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

82.1820

Table of Contents