Avaya DEFINITY Server R Manual page 316

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Upgrading a Multicarrier G2 Universal Module to Avaya
DEFINITY Server R EPN running Avaya MultiVantage
Software
6. Behind control carrier A of EPN cabinet 3:
7. Behind port carrier B of EPN cabinet 2:
8. Behind port carrier B of EPN cabinet 3:
5-124
Issue 5 October 2002
Install a lightwave transceiver on the cable connector at slot 3A02.
Connect the fiber optic cable to the transceiver just installed.
Route the fiber cable to the cable tray and down, out of the cabinet,
through the cable manager to the PDS cross-connect facility.
Connect the fiber cable to the lightguide interconnect unit provided.
Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
Coil up the surplus fiber cable and place it in the cable manager.
Install a lightwave transceiver on the cable connector at slot 2B03.
Connect a fiber optic cable to the transceiver just installed.
Route the fiber cable to the cable tray and down, out of the cabinet,
through the cable manager to the PDS cross-connect facility.
Connect the fiber cable to the lightguide interconnect unit provided.
Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
Install a lightwave transceiver on the cable connector at slot 3B03.
Connect the fiber cable to the transceiver just installed.
Route the fiber cable to the cable tray and down, out of the cabinet,
through the cable manager to the PDS cross-connect facility.
Connect the fiber cable to the lightguide interconnect unit provided.
Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
Coil up the surplus fiber cable and place it in the cable manager.
555-233-115

Advertisement

Table of Contents
loading

Table of Contents