Avaya DEFINITY Server R Manual page 168

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Upgrading R5si/R6si to an Avaya DEFINITY Server R
EPN running Avaya MultiVantage Software
3, 6, 9, or 12 pairs of wall-field cables (provided with CSUs)
5, 10, or 15 dB attenuators (single-mode fiber only)
5-dB Attenuator
10-dB Attenuator
15-dB Attenuator
For 1 or 2 Collocated Expansion Port Networks
1. Behind port carrier B of the multicarrier PPN. See
4-10:
a. Install a lightwave transceiver on the connector at slot 1B02.
b. Connect 1 end of the appropriate fiber optic cable to the lightwave
c. Route the fiber optic cable from the lightwave transceiver to the
d. Carefully attach the fiber optic cable (with cable ties) to the wall of
2. Behind control cabinet A of EPN stack 2:
a. Install a lightwave transceiver on the connector at slot 2A01.
b. Connect the other end of the fiber optic cable from the PPN to the
c. Carefully attach the fiber optic cable (with cable ties) to the rear
d. Coil up the surplus length of fiber optic cable, and place the coil
4-42
Issue 5 October 2002
106060718
106060734
106061021
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
transceiver at slot 1B02.
cabinet's cable tray and down out of the cabinet to the EPN stack.
the cable tray at the built-in cable tie positions.
lightwave transceiver at slot 2A01.
covers of the EPN stack.
either in the cable manager or on the bottom shelf (holding the
power supply) of the PPN cabinet.
Figure 4-9
and
Figure
555-233-115

Advertisement

Table of Contents
loading

Table of Contents