Avaya DEFINITY Server R Manual page 346

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Adding New Carriers and EPN Cabinets
Relocate Port Carrier B
Refer to
Add a Switch Node Carrier
Connect Management Terminal or PC
1. Behind control carrier "A," disconnect the management terminal or PC
cable from the "TERM" connector, and reconnect the cable to the "DOT"
(duplication option terminal) connector.
Reseat DEFINITY LAN Gateway System
1. Reseat the LAN Gateway assembly into its backplane connectors.
Reseat DEFINITY AUDIX System
1. If a DEFINITY AUDIX System resides in the PPN or an EPN (where PPN
port carrier "B" was relocated), reseat the AUDIX assembly to its backplane
connectors.
Power Up System
1. At an EPN (where PPN port carrier "B" was relocated), set the main circuit
breaker to ON.
2. At the PPN, set the main circuit breaker to ON.
3. The system performs a level 4 rebooting process, loading the system
program and default or current translations from the disk. Rebooting takes
5 to 11 minutes.
4. Type the reset system 4 and press
removable media to memory.
5. Clear any alarms.
6. Type save translation [both] and press
made in Step 8.
7. Type restore disk [both] full and press
removable media to disk.
8. Verify that the EMERGENCY TRANSFER CONTROL switch is set to
AUTO. This restores the system to the normal operating mode.
6-26
Issue 5 October 2002
NOTE:
Ignore alarms for now.
to relocate the removed port carrier.
to copy the translations from
Enter
if translation changes were
Enter
to copy the translations from
Enter
555-233-115

Advertisement

Table of Contents
loading

Table of Contents