Phase 2 Hardware Addition/Replacement
Unlock DUPINT Switches (High/Critical
reliability only)
1. Move the SPE SELECT switches to the AUTO position one at a time.
Wait for System Refresh (High/Critical reliability
only)
1. Type status spe and press
interchange. When it is ready,
SPE B refreshes after 5 minutes. If the fields display something other than
the above, see the appropriate maintenance sections.
2. Verify that the removable media is present and in service on both SPEs. At
this point the term tape is replaced by removable-media.
Install the License File
Pre-installation
1. Type save translation and press
After the translations have been copied (about 10 minutes), the system
returns an error code, which must be a zero; otherwise, the translations are
not copied.
2. Type reset system 3 and press
Wait until the system has completely reset before continuing.
3. If the system has IP endpoints registered, unplug the Ethernet cable from
the TN799 (C-LAN) circuit pack.
This disconnects (unregisters) all IP endpoints.
4. Type set time and press
Ensure that the system date and time are set correctly.
555-233-115
Enter
The Standby Refreshed field shows yes
The Standby Shadowing field shows on
The Standby Handshake field shows up
Enter
to make sure the active side is ready for
.
Enter
.
Enter
.
Issue 5 October 2002
2-39
Need help?
Do you have a question about the DEFINITY Server R and is the answer not in the manual?