Avaya DEFINITY Server R Manual page 376

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Adding New Carriers and EPN Cabinets
Disconnect Cables (Std only)
NOTE:
Skip these steps if a switch node carrier is being added to an empty carrier
position.
1. Label the ground cables associated with the port carrier to be removed.
2. Disconnect the ground cables from the top of the port carrier to be
removed. Allow the cables to hang down for now.
Disconnect Cables (H/C only)
1. With the cable retainer in front of you and the part number visible, locate
the slot that is almost vertical (adjacent to the part number.) Insert a
flat-blade screwdriver with a wide blade (1/4-in. recommended) into the
slot, and twist the screwdriver. The retainer will snap open easily so that
the cable can be removed.
2. At the cabinet, disconnect the previously labeled cables associated with
the carrier to be removed.
Remove Circuit Packs from Port Carrier
NOTE:
Skip these steps if a switch node carrier is being added to an empty carrier
position.
1. To ensure that circuit packs and power units in the port carrier are properly
replaced, label each component with its slot number.
2. Disconnect the power cords from the power units in the carrier.
3. Remove all circuit packs and power units from carrier. Store the circuit
packs in the static-proof packaging.
4. Remove the circuit pack blanks from slots that do not contain circuit packs.
5. Remove the front trim plate from the carrier by pulling it straight off.
6-56
Issue 5 October 2002
555-233-115

Advertisement

Table of Contents
loading

Table of Contents