Preliminary Procedures - Avaya DEFINITY Server R Manual

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Preliminary Procedures

Preliminary Procedures
Save Translations
1. Log in at the Manager II on the G2.
2. Type rtx (run tape, execute) and press
write all translation information from memory to the tape.
3. Remove the system tape and install the backup tape.
4. Type rtx and press
Make Source Tape for TRACS Report
A spare G2 tape must be acquired from the remediation before performing the
following steps. For each processor, there must always be 2 tapes on site with the
G2 system. Do not send a system or backup tape to STS. After performing the
previous procedures, copy the G2 translations to the spare tape used to make the
TRACS report.
1. Remove the backup tape and install the spare tape.
2. Type rtx and press
translation information from memory to the tape.
3. Remove the source tape.
4. Insert the system tape.
5. Mail the source tape (next-day delivery) to STS for use in making the G2
TRACS report.
System Upgrades
There are many configurations of DEFINITY G2 in the field. Each system can
have a unique configuration. However, to simplify the upgrade:
Replace the existing common control with a multicarrier PPN
Replace existing traditional modules with EPNs
Replace existing universal modules with EPNs
A new multicarrier cabinet (MCC1) would then always serve as the PPN.
Upgrading a G2 universal module to a new EPN requires hardware changes
(including carrier replacement).
555-233-115
Enter
.
Enter
. This command instructs the system to write all
Enter
. This instructs the system to
Issue 5 October 2002
5-9

Advertisement

Table of Contents
loading

Table of Contents