Tape Drive: Power Down Spe B; Remove The Un332B And Tape Drive; Install The Un332C And Optical Drive - Avaya DEFINITY Server R Manual

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Phase 1 Hardware Replacement

Tape Drive: Power Down SPE B

!
CAUTION:
Do not power down the whole cabinet; it is not necessary.
NOTE:
If there are two power supplies, power down the SPE by removing the
power plug on the left side of the carrier then by removing the power plug on
the right side of the carrier. If there is only one power supply, remove the one
power plug on the right side.
For standard reliability, power down the SPE. This causes a service interruption.
For high or critical reliability, power down SPE B only.

Remove the UN332B and Tape Drive

1. Remove the blank faceplate next to the MSSNET slot in the SPE B carrier.
2. Remove the UN332/B circuit pack from the SPE B carrier and place it in
antistatic packing material.
3. Remove the tape from the tape drive (TN1656).
4. Remove the tape drive from the SPE B carrier and place it in antistatic
packing material.

Install the UN332C and Optical Drive

NOTE:
To properly seat a circuit pack, push firmly on the front of the faceplate until
the latch reaches the bottom rail of the carrier. Then close the latch until it is
fully engaged.
1. Insert the UN332C circuit pack into the MSSNET slot in the SPE B carrier.
2. Replace the blank faceplate next to the MSSNET circuit pack.
3. Insert the TN2211 optical drive
slot in the SPE B carrier. It uses only 2 slots.
555-233-115
(Figure
2-1) into the rightmost TAPE DRIVE
Issue 5 October 2002
2-25

Advertisement

Table of Contents
loading

Table of Contents