Definity Audix Power Procedures - Avaya DEFINITY Server R Manual

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

DEFINITY AUDIX Power Procedures

11. If any fiber optic cables were removed from Lightguide Interconnect Units
(LIUs) or Fiber Patch Panels, remove the associated cable labeling. This
will prevent confusion if existing fiber is later moved.
12. Return all unused equipment (not owned by the customer) to Avaya
according to the requirements outlined in:
BCS/Material Logistics, MSL/Attended Stocking Locations
Methods and Procedures for Basic Material Returns
Troubleshooting
Message Waiting Lamps On
This usually means that all affected port-related translations were not
unadministered.
1. Type clear amw all <extension> and press
waiting lamp for the specified extension.
2. Repeat the command for each extension with a lit message waiting lamp.
DEFINITY AUDIX Power Procedures
Power Down the AUDIX System
A yellow caution sticker on the system's power unit notifies technicians to shut
down the DEFINITY AUDIX System prior to powering down the system.
1. Log into the AUDIX System as craft.
2. Type reset system shutdown and press
3. Press
4. The SHUTDOWN Completed message appears when the AUDIX is
successfully shut down. This takes about 2 minutes.
5. You can now shut down the carrier or remove the AUDIX System for
service.
!
CAUTION:
If leaving AUDIX System in the carrier, back it out about 2 in. (5 cm) to
eliminate the possibility of damage due to power surges.
555-233-115
again to start the shutdown process.
Enter
. This clears the message
Enter
.
Enter
Issue 5 October 2002
6-95

Advertisement

Table of Contents
loading

Table of Contents