Upgrading R5si/R6si to an Avaya DEFINITY Server R
EPN running Avaya MultiVantage Software
4. Behind switch node carrier D of PPN cabinet 1:
a. For each EPN, install 1 lightwave transceiver on a cable connector
b. Connect 1 end of each fiber optic cable to each lightwave
c. Carefully attach the fiber optic cables (with cable ties) to the wall of
5. Behind port cabinet B of each single-carrier EPN:
a. Install a lightwave transceiver on cable connector at slot B02.
b. Connect the other end of the fiber optic cable to the lightwave
c. Carefully attach the fiber optic cable (with cable ties) to the rear
d. Coil up the surplus length of fiber optic cable, and place the coil
4-62
Issue 5 October 2002
with the following order of slots: 1E20, 1E03, 1E19, 1E04, 1E18,
1E05, and so forth.
transceiver, just installed.
the cable tray at the built-in cable tie positions.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
transceiver, just installed, at slot B02.
covers of the EPN stack.
either in the cable manager or on the bottom shelf (holding the
power supply) of the PPN cabinet.
555-233-115
Need help?
Do you have a question about the DEFINITY Server R and is the answer not in the manual?