Avaya DEFINITY Server R Manual page 180

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Upgrading R5si/R6si to an Avaya DEFINITY Server R
EPN running Avaya MultiVantage Software
2. Behind port cabinet B of EPN stack 2:
a. Install a lightwave transceiver on the connector at slot 2B02.
b. Connect the other end of the fiber optic cable coming from the PPN
c. Carefully attach the fiber optic cable (with cable ties) to the rear
d. Coil the surplus fiber cable and place it either in the cable manager
3. Behind port carrier D of the multicarrier PPN:
a. Install a lightwave transceiver on the connector at slot 1D02.
b. Connect a fiber optic cable to the transceiver just installed.
c. Route the fiber cable to the cabinet's cable tray and down, out of the
d. Carefully attach the fiber optic cable (with cable ties) to the wall of
4. Behind control cabinet A of EPN stack 2:
a. Install a lightwave transceiver on the connector at slot 2A01.
b. Connect the other end of the fiber optic cable coming from the PPN
c. Carefully attach the fiber optic cable (with cable ties) to the rear
d. Coil the surplus fiber cable and place it in the cable manager or on
4-54
Issue 5 October 2002
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
to the lightwave transceiver just installed.
covers of the EPN stack.
or on the bottom shelf (holding the power supply) of the PPN
cabinet.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
cabinet, to the EPN stack.
the cable tray at the built-in cable tie positions.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
to the lightwave transceiver at slot 2A01.
covers of the EPN stack.
the bottom shelf (holding the power supply) of the PPN cabinet.
555-233-115

Advertisement

Table of Contents
loading

Table of Contents