Interconnect Port Networks with Fiber Optic Cabling
For 1 to 15 Critical Reliability EPNs.
1. Behind the PPN cabinet. See
a. Install a lightwave transceiver on cable connector at slot 1E01.
b. Install a lightwave transceiver on cable connector at slot 1E02.
c. Connect the metallic intracarrier cable to the lightwave transceivers
d. Install a lightwave transceiver on cable connector at slot 1D01.
e. Install a lightwave transceiver on cable connector at slot 1D02.
f. Connect the metallic intracarrier cable to the lightwave transceivers
2. Behind switch node carrier E of PPN cabinet 1:
a. For each EPN, install 1 lightwave transceiver on a cable connector
b. Connect 1 end of each fiber optic cable to each lightwave
c. Carefully attach the fiber optic cables (with cable ties) to the wall of
3. Behind control cabinet A of each single-carrier EPN:
a. Install a lightwave transceiver on cable connector at slot A01.
b. Connect the other end of the fiber optic cable to the lightwave
c. Carefully attach the fiber optic cable (with cable ties) to the rear
d. Coil the surplus length of fiber optic cable, and place the coil either
555-233-115
at slots 1E01 and 1E02.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceivers
at slots 1D01 and 1D02.
with the following order of slots: 1E20, 1E03, 1E19, 1E04, 1E18,
1E05, and so forth.
transceiver, just installed.
the cable tray at the built-in cable-tie positions.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
transceiver, just installed, at slot A01.
covers of the EPN stack.
in the cable manager or on the bottom shelf (holding the power
supply) of the PPN cabinet.