Avaya DEFINITY Server R Manual page 310

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Upgrading a Multicarrier G2 Universal Module to Avaya
DEFINITY Server R EPN running Avaya MultiVantage
Software
7. Behind port carrier B of EPN cabinet 2:
8. Behind port carrier B of EPN cabinet 3:
Figure Notes
1. Cabinet 1 PPN
2. Cabinet 2 EPN 1
Figure 5-28. Critical Reliability with 2 or 3 Port Networks
5-118
Issue 5 October 2002
Install a lightwave transceiver on cable connector at slot 2B03.
Connect 1 end of the fiber optic cable to the lightwave transceiver,
just installed, at slot 2B03.
Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
Install a lightwave transceiver on cable connector at slot 3B03.
Connect the other end of the fiber optic cable to the lightwave
transceiver, just installed, at slot 3B03.
Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
At the top of the cabinet, coil the surplus fiber optic cable, and
carefully attach the coil to the wall of the cable tray.
3. Cabinet 3 EPN 2
555-233-115

Advertisement

Table of Contents
loading

Table of Contents