Avaya DEFINITY Server R Manual page 324

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Adding New Carriers and EPN Cabinets
Shut Down DEFINITY AUDIX System
1. If a DEFINITY AUDIX resides in the MCC port network to be upgraded,
shut down the AUDIX assembly and allow the disk to completely spin
down. Refer to
!
2. Unseat the AUDIX assembly from its backplane connectors.
Power Down MCC Port Network
1. At the MCC port network, set the main circuit breaker to OFF.
Install Port Carrier
1. Open the rear doors.
2. Remove the blank port carrier panel by pushing outward on panel from the
rear of the cabinet until the panel clears the 4 retaining pins on the cabinet
frame. See
3. Use a screwdriver to loosen and remove the 4 retaining pins from the
cabinet frame.
4. Align the carrier through the front of the system cabinet with the 4 pilot
holes on cabinet frame.
5. Insert self-tapping screws in the pilot holes and tighten.
6. Attach the magnetically-held nomenclature panel to front of carrier.
7. At the rear, install 8 grounding jumpers from the adjacent backplane to the
new carrier backplane wiring
8. Connect a 9-pin D subminiature plug on right side of cabinet to P1
connector on carrier. If necessary, cut the tie wrap holding the intercabinet
cable to the upright in the area of the carrier being installed.
9. Connect the TDM/LAN cable to the newly installed port carrier. See
6-4,
6-4
Issue 5 October 2002
''DEFINITY AUDIX Power Procedures'' on page
WARNING:
Neglecting to shut down an AUDIX assembly before powering down
the system cabinet where it resides can damage the AUDIX disk.
Figure
6-1.
NOTE:
Support the carrier by the molded-in support pins above the top
mounting holes.
Figure
6-5,
Figure
6-6, or
(Figure 6-2
and
Figure
Figure 6-7
and
Table
6-95.
6-3).
Figure
6-1.
555-233-115

Advertisement

Table of Contents
loading

Table of Contents