Avaya DEFINITY Server R Manual page 375

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Add a Switch Node Carrier
Back Up Disk
1. Type backup disk and press
the backup tape(s). This takes 30 to 40 minutes.
Shut Down DEFINITY LAN Gateway System
If a DEFINITY LAN Gateway system resides in the control cabinet to be
upgraded, prepare to shut down the DEFINITY LAN Gateway assembly and allow
the disk to completely spin down.
!
CAUTION:
Neglecting to shut down the LAN Gateway assembly before powering down
the system cabinet where it resides can damage the LAN Gateway disk.
1. Log onto the DEFINITY LAN Gateway.
2. On the main menu, select Maintenance > Reset System > Shutdown.
3. Unseat the LAN Gateway assembly from its backplane connectors.
Shut Down DEFINITY AUDIX System (if
necessary)
!
WARNING:
Neglecting to shut down the AUDIX assembly before powering down the
system cabinet where it resides can damage the AUDIX disk.
1. Shut down the AUDIX assembly and allow the disk to completely spin
down. Refer to
6-77.
!
CAUTION:
If leaving AUDIX System in the carrier, back it out about 2 in. (5 cm) to
eliminate the possibility of damage due to power surges.
Power Down Cabinet
1. At the PPN, set the main circuit breaker to OFF.
Remove Doors
1. Remove the front and rear doors from the multicarrier cabinet where the
switch node carrier is to be installed.
555-233-115
to write all information from the disk(s) to
Enter
''Install a New EPN Cabinet in an Existing System'' on page
Issue 5 October 2002
6-55

Advertisement

Table of Contents
loading

Table of Contents