Avaya DEFINITY Server R Manual page 377

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Add a Switch Node Carrier
Remove Port Carrier
NOTE:
Skip these steps if standard reliability and a switch node carrier is being
added to an empty carrier position.
NOTE:
Note the position of the TDM/LAN cables before disconnecting.
1. If a switch node carrier is being installed in the D position of an EPN,
remove the TDM/LAN cable from between the D and A carriers.
For other EPNs or the PPN, disconnect 1 end of the TDM/LAN cable
(between the D and A carriers) from the D carrier.
2. Remove the ZAHF4 TDM/LAN bus terminator from slot 21 of the D carrier.
3. Disconnect 1 end of the 8 ground straps (between the D and E carriers)
from the D carrier (see
high/critical reliability, respectively). These straps will be reconnected to the
new D carrier.
4. Disconnect the 8 ground straps from the D carrier (between the D and A
carriers or the D carrier and the enhanced fan unit—see
Figure
5. Disconnect the P1 (small 9-pin) connector from the D carrier. Move the
cable into a position where it will not interfere with removing the carrier.
6. Remove the 4 screws (top 2 first) holding the D carrier to the cabinet frame.
Use a long-handle screwdriver or 5/16-inch socket with a 10-inch
extension.
555-233-115
Figure 6-30
6-31). Reconnect the 8 ground straps to the D carrier.
or
Figure 6-31
for standard or
Figure 6-30
Issue 5 October 2002
or
6-57

Advertisement

Table of Contents
loading

Table of Contents