Suzuki Liana RH413 Service Manual page 737

Table of Contents

Advertisement

3) To ensure lubrication of input shaft (1), air blow oil
holes (2) and make sure that they are free from any
obstruction.
4) Fit high speed synchronizer sleeve (4) to hub (3),
insert 3 keys (2) in it and then set springs (1) as
shown in figure.
NOTE
• No specific direction is assigned to high
speed synchronizer sleeve or each key but
it is assigned as assembly.
• Size of high speed synchronizer sleeve,
hub, keys and springs is between those of
low speed and 5th speed ones.
Synchronizer key installation position
"A" = "B"
"C": Left side (Short flange)
"D": Key way
5) Drive in right bering (1) to input shaft (2) using
special tool and hammer.
Special tool
(A): 09913–80113
I2RH01520048-01
6) Install 3rd gear needle bearing, apply oil to it, then
install 3rd gear (2) and synchronizer ring (3).
7) Drive in high speed sleeve & hub assembly (4) by
using special tool and hammer.
NOTE
• While press-fitting sleeve & hub, make
sure that synchronizer ring key slots are
aligned with keys in sleeve & hub
I2RH01520049-01
assembly (4).
• Check free rotation of 3rd gear after press-
fitting sleeve & hub assembly.
• Synchronizer rings for 3rd and 4th are
identical.
Special tool
(B): 09913–84510
I2RH01520050-01
Manual Transmission/Transaxle:
1. Input shaft
A: Key way
5B-28
I3RH0A520019-01
I2RH01520051-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liana rh416

Table of Contents