Suzuki Liana RH413 Service Manual page 1034

Table of Contents

Advertisement

8B-109 Air Bag System:
ii) Clear space (3) on ground about 185 cm (6
ft) in diameter where side air bag (inflator)
module for deployment. Paved, outdoor
location where there is no activity is
preferred. If outdoor location is not available,
space on shop floor where there is no activity
and provide sufficient ventilation. Ensure no
loose or flammable objects are within
deployment area.
iii) Place deployment fixture (A) on ground in
Step i).
Special tool
(A): 09932–75041
iv) Fill plastic reservoir in deployment fixture (A)
with water or sand. This is necessary to
provide sufficient stabilization of fixture
during deployment.
v) Attach side air bag (inflator) module (1) in
deployment fixture using mounting
attachment, hold-down bolts & nuts and M8
bolt & nut (2).
NOTE
Make sure that deploying direction faces as
shown in figure against mounting
attachment.
CAUTION
!
Be sure to use M8 size and 7T strength bolt
and nut for fixing side air bag (inflator)
module to deployment fixture (A).
1
3
2
(A)
I3RH0A820081-01
d) For seat belt pretensioner
i)
Cut webbing (1) at tongue plate stopper (3)
of seat belt pretensioner (2) side as shown.
NOTE
Hold seat belt pretensioner (2) vertically in
the same condition as it is installed.
Otherwise, webbing can't be pulled out.
ii) Remove tongue plate (4) and shoulder
anchor (5) from webbing.
2
iii) Tie webbing (1) tightly at 10 cm (3.9 in.) from
cutting edge as shown.
iv) Tie seat belt pretensioner (2) with wire
harness (3) to wheel-installed tire (4) as
shown.
Wire harness specification
Stripped wire harness section 1.25 mm
(0.0019 in.
2
) or more (Stripped wire
harness diameter 1.25 mm (0.05 in.) or
more)
NOTE
Wind wire harness (3) around at least 3 times.
1
5
4
3
I2RH01820066-01
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liana rh416

Table of Contents