Starting Motor Inspection - Suzuki Liana RH413 Service Manual

Table of Contents

Advertisement

1I-7 Starting System:

Starting Motor Inspection

Plunger
Inspect plunger for wear. Replace if necessary.
Magnetic Switch
Push in plunger and release it. The plunger should
return quickly to its original position. Replace if
necessary.
Pull-in coil open circuit test
Check for continuity across magnetic switch "S" terminal
(1) and "M" terminal (2). If no continuity, coil is open and
should be replaced.
Hold-in coil open circuit test
S3RH0A1906003
Check for continuity across magnetic switch "S" terminal
(1) and coil case. If no continuity, coil is open and should
be replaced.
Rear Bracket Bush
I2RH01190008-01
Inspect bush for wear or damage. Replace if necessary.
Brush
• Check brushes for wear.
Measure length of brushes and if below the limit,
replace the brush.
I2RH01190009-01
Brush length
Standard
Limit
I2RH01190010-01
• Install brushes to each brush holder and check for
smooth movement.
Spring
Inspect brush springs for wear, damage or other
abnormal conditions. Replace if necessary.
1.2 kW and 1.4 kW
1.0 kW type
14.0 mm (0.55 in.)
12.3 mm (0.48 in.)
9.0 mm (0.36 in.)
7.0 mm (0.28 in.)
I2RH01190011-01
I2RH01190012-01
type
I2RH01190013-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liana rh416

Table of Contents