Download  Print this page

Operation Switch Wiring; Operation Switch Input - Mitsubishi Electric GOT2000 Series User Manual

Graphic operation terminal.
Hide thumbs

Advertisement

9.4.3

Operation switch wiring

The operation switch is connected to the PLC through an external cable and the Connector Conversion Box.
■1. Connection example
■2. Pin layout
Model name
SW-COM
Connector Conversion
Terminal block 2
Box
9.4.4

Operation switch input

The operation switch (SW1 to SW6) can directly connect to the PLC input and be used in the sequence program as general
input devices.
• The operation switch is loaded into the PLC as the momentary switch of the a contact.
When wired to PLC X0
X0
• In the case of handling the input as the b contact or the alternate switch, create the input in the sequence program.
Handy GOT
SW-COM
SW1
SW2
SW3
SW4
SW5
SW6
SW1
SW2
Terminal block 2
Terminal block 2
1
2
Operation switch action
Y0
X0
Connector
conversion box
Terminal
block 2
1
2
3
4
5
6
7
Terminal No.
SW3
SW4
Terminal block 2
Terminal block 2
3
4
ON
OFF
ON
OFF
PLC
COM
X0
X1
X2
X3
X4
X5
SW5
SW6
Terminal block 2
Terminal block 2
5
6
9.4 Switch Wiring
7
9
9 - 13

Advertisement

Table of Contents

   Related Manuals for Mitsubishi Electric GOT2000 Series

Comments to this Manuals

Symbols: 0
Latest comments: