Verify Timing to the System
Return to Task List
1
To administer the Stratum 3 clock, type
2
Type 3 in the stratum field.
3
Type the port network number where the TN780 Tone-Clock circuit packs reside in the port
network field.
NOTE:
Wait 1 minute for the software to reconfigure the system synchronization.
4
Verify the results of test 649. If test 649 fails with a code of 2101, then check the wiring for
EXTSYN0 and EXTSYN1. Refer to Maintenance for Avaya DEFINITY® Server SI (555-233-
123).
If test 649 is successful, then the system is getting correct timing from the Stratum 3 clock.
Return to Task List
Perform Complete System Test
Return to Task List
Run the complete system test with the
hardware group tests are described in the Maintenance for Avaya DEFINITY® Server SI (555-233-123)
documentation for your system.
NOTE:
This test takes several hours. It may be best to run the test in the background, or at night,
or both.
Resolve Alarms
Return to Task List
After the test has completed, inspect the alarms log. Type display alarms and resolve the alarms in the
usual manner.
Check the error log for evidence of failure. The only failure results logged should be the outcome of tests
requiring a connected station, where a station is not connected to the port under test. Repair all other
failures or refer them to a maintenance technician for repair.
Resolve any alarms that may exist using the Maintenance for Avaya DEFINITY® Server SI (555-233-
123) documentation for your system.
Return to Task List
SI Installation and Upgrades
June 2004
Test Telephones and Other Equipment
change synchronization
option in the
Allports
SPE Interchange
Perform Complete System Test
and press Enter.
and
test modes. The
Long
739