Avaya MCC1 Installation And Upgrades page 435

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Figure 157: 3-Pair Modularity for Trunk Pairs for 3-Pair Tie Trunks
Figure notes
1
Green Field
2
1-Pair Jumpers
Return to Task List
Install Cables Between Cabinet and MDF
Return to Task List
1
Install D rings on the wall between the cable slack manager and the terminal/connecting blocks
mounted on the MDF.
2
Install a self-adhesive port label on the back of each connector on the connector cable. Position
the labels so the cabinet connector retainers do not cover them.
3
At the rear of the cabinet, connect 1 end of the connector cable to the assigned connector.
4
Route the cable down the rear of the cabinet, through the cable slack manager, and to the MDF.
5
At the MDF, connect the other end of the cable to the assigned terminal/ connecting block
connector.
6
Store the cable slack in the cable slack manager.
7
Repeat Steps 2 through 6 until all cables are installed.
Return to Task List
SI Installation and Upgrades
June 2004
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
3
Pairs
4
Purple Field
Install Telecommunications Cabling
Patch Cord/Jumper Installation and Administration
3
13
14
15
16
17
18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12
r758537b MMR 031496
435

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents