Connect power and grounding and the SAT terminal [75 XE upgrade]
Return to Task List
1
Reconnect the 6-AWG cabinet ground wire from the ground bar in the cabinet.
2
Reconnect the coupled bonding conductor.
3
Reconnect the cabinet power cords behind each cabinet.
4
Reconnect the SAT terminal.
Return to Task List
Close PPN stack without earthquake protection [75 XE upgrade]
Return to Task List
1
Install the front door on each cabinet.
2
Install a DEFINITY label on each existing port cabinet.
3
Install the top and bottom rear covers.
— Verify that the correct rear covers are installed on the new control cabinets.
— Do not use these rear covers on the port cabinets.
Return to Task List
Close PPN stack with earthquake protection [75 XE upgrade]
Return to Task List
1
Install the upper and lower rear covers.
— Use all the screws except the screws that run along the top and bottom of the cabinet. Do
not tighten the screws.
— Note that on a critical-reliability R7si or R8si, the rear covers for the control cabinets need
2 detents. One is for the TDM/LAN cable and the other is for the ICC cables.
2
Line up the 4 holes in the ground plate with the 4 holes at the bottom of the lower rear cover of the
upper cabinet. Install the 4 screws but do not tighten them.
3
Line up the ground plate with the top holes of the upper rear cover of the lower cabinet. Install the
4 screws but do not tighten them.
4
At the front of the cabinet, line up the earthquake front plate with the holes at the top and bottom
of the cabinet. See
5
Tighten all screws.
6
Repeat
Step 1
7
Install the front door on each cabinet.
8
Install a DEFINITY label on each existing port cabinet.
SI Installation and Upgrades
June 2004
Figure
68. Install the 8 screws but do not tighten them.
through
Step 5
for the remaining cabinets.
System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
271