System 75 Small-Cabinet to R8si (Blowback)
.
Upgrade preparation steps
What
1
Check that circuit packs vintages are inspected.
2
Check that all adjunct versions are compatible with the new
switch version.
3
Verify expansion interface compatibility for packet bus
applications:
If the new system will have one or more expansion port
network cabinets and will run any packet applications, do not
reuse the TN776 expansion interface circuit packs; they must
be replaced with TN570 circuit packs.
4
Identify proper TDM/LAN bus cables and terminators for the
system.
If PACCON is not currently enabled, the cables and
terminators may need to be replaced for V3 and later si
systems, R5/R6vs systems, and SRPs upgrading to Avaya™
Communication Manager.
Packet applications currently running in one port network do
not guarantee that the system has the correct hardware.
Adding a packet application to another network without
verifying the TDM/LAN bus cables and terminators
frequently causes upgrade problems.
We recommend that you schedule a time to replace the cables
and terminators before the upgrade. Note that this requires a
service outage.
5
Check for software upgrade compatibility:
— current software patches that will need to be re-
applied
— software upgrades that include all relevant bug fixes
6
Use the latest software QPPCN to check the vintages of all
circuit packs that will be reused in the upgrade.
a
Replace circuit packs that have unusable vintages.
b
Make a final vintage check.
For current information about usable vintages in a
DEFINITY ECS system, see the Stockable, Minimum
Usable Vintages, & Certifiable Vintages, COMPAS
ID 42751.
7
For blowback upgrades only:
blowback tape is converted and written to removable media.
This takes 2 weeks and must be done before the upgrade.
282
Make the Blowback
Tape. The
When
Who
Before upgr
Project Mgr
Before upgr
Project Mgr
Before upgr
Project Mgr
Before upgr
Project Mgr
Before upgr
Project Mgr
Before upgr
Design Spec
Before upgr
Tech or
Design Spec
SI Installation and Upgrades
June 2004

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents