Avaya MCC1 Installation And Upgrades page 261

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

2
Behind control cabinet A of the single-carrier EPN:
— Install the same kind (either 9823-A or 9823-B) of lightwave transceiver on cable
connector at slot 2A01.
— Connect the fiber-optic cable to the 9823-type lightwave transceiver at slot 2A01.
— Route the fiber-optic cable from the 9823-type lightwave transceiver to the cabinet cable
tray and out of the cabinet through the cable manager to the PDS cross-connect facility.
— At the PDS cross-connect facility, connect the fiber-optic cable to the lightwave-interface
unit provided.
— Delicately attach the fiber-optic cable (with cable ties) to the rear covers of the EPN stack.
— Coil up the surplus length of fiber-optic cable, and place the coil in the cable manager.
Figure 60: Standard-Reliability Release 8si with Two Port Networks
Rear View
Port Cabinet - J58890H
18 17 16 15 14 13 12 11 10
D
Port Cabinet - J58890H
18 17 16 15 14 13 12 11 10
C
Port Cabinet - J58890H
18 17 16 15 14 13 12 11 10
B
Control Cabinet - J58890L
10
9
8
7
6
5
4
3
2
A
Cabinet Stack 1
SI Installation and Upgrades
June 2004
9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
3
2
1
1
AUX
Terminal
PPN
System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
Port Cabinet - J58890H
18 17 16 15 14 13 12 11 10
D
Port Cabinet - J58890H
18 17 16 15 14 13 12 11 10
C
Port Cabinet - J58890H
18 17 16 15 14 13 12 11 10
B
Expansion Control Cabinet - J58890N
AUX 18 17 16 15 14 13 12 11 10
A
To Cabinet 2
A1
To Cabinet 1
A1
Rear View
9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
3
2
1
TERM
Cabinet Stack 2
EPN
261