Avaya MCC1 Installation And Upgrades page 493

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Figure 187: Example System Status Report for All Cabinets
Return to Task List
Test Expansion Interface Circuit Packs
Return to Task List
Check each Expansion Interface (EI) circuit pack in the system.
1
Type
test board UUCSS
(EI) circuit pack in the system, and press Enter.
NOTE:
Labels on the port network and carrier and on the strip under the circuit pack contain this
information.
2
Verify the screen displays test results similar to
Interface Board 2A01,
3
If any result is
4
Repeat Steps 1 and 2 for each Expansion Interface circuit pack.
SI Installation and Upgrades
June 2004
where
is the cabinet, carrier, and slot for an Expansion Interface
UUCSS
on page 494. This example is for board 2a01.
, check the connections for the fiber optic link.
FAIL
Figure 188, Sample Test Results for Expansion
Test the System
LED Indicators
493

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents