Avaya MCC1 Installation And Upgrades page 307

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Figure 80: Cabinet earthquake mounting
Return to Task List
Install circuit packs [75 small upgrade]
Return to Task List
!
Before inserting or removing a circuit pack from a cabinet, put on a wrist strap and attach
its plug or clip to the cabinet's frame.
1
For a carrier upgrade only:
Install the new R8si control circuit packs into control carrier A. See
J58890AH control carrier,
(provided with the R8si translation memory card) as a guide.
!
The reinstalled port circuit packs must conform to the usable vintage requirements for an
R8si system (see Reference Guide for Circuit-Pack Vintages and Change Notices).
2
Install the port circuit packs previously removed into the A carrier using the decal and the
annotated
SI Installation and Upgrades
June 2004
NYLON
INSULATING
WASHER
(2 REQ'D)
STIFFENER
CABINET FOOT
NOTE:
FLOOR
NOTE: BOLT DOES NOT RUN THROUGH CABINET FOOT
WARNING:
on page 308, the new decal, and the annotated
WARNING:
list configuration all
(provided with the R8si translation memory card) as a guide.
System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
concrete floor
CABINET
3/8-16 X 3.25 INCH
HEX BOLT
(2 REQ'D)
CONCRETE ANCHOR
(2 REQ'D)
SIDE VIEW
Figure 81, Representative
list configuration all
307

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents