Avaya MCC1 Installation And Upgrades page 308

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
NOTE:
The new R8si control carrier has only 1 more port slot than a J58890AB control carrier.
You may need to move and retranslate circuit packs. If it was not done before the upgrade,
relocate the circuit packs now. The relocated port circuits will have to be translated after
the system is rebooted with the R8si translation memory card.
3
Install circuit-pack blanks in slots not equipped with circuit packs.
Figure 81: Representative J58890AH control carrier
Z100A1
631DA1
Return to Task List
Move 25-pair cables from System 75 to R8si [75 small upgrade]
Return to Task List
1
Remove any reusable 25-pair cables from the rear of the old system.
For G3vs upgrades
replace these cables with new, longer cables.
2
Attach any reusable 25-pair cables to the needed connectors on the rear of the si cabinet.
3
Attach any new 25-pair cables to the needed connectors on the rear of the si cabinet.
4
Route the new cables to the MDF and attach.
Return to Task List
308
Service
Lucent
B
S
AUTO
P
A
E
OVERIDE
ALARMS
MAJ
MIN
WRN
ACK
blanks
EMER TR
ON
or
AUTO
OFF
B
B
B
B
l
l
l
l
a
a
a
a
n
n
n
n
k
k
k
k
Z
T
T
1
N
N
0
7
7
0
9
9
C
2
0
B
Cables connecting the wall-mount G3vs and the si cabinet may be too short. If so,
Port/Service
Port
BBI
LINK
TRMT
RCV
C
A
R
D
I
N
U
S
E
B
B
B
l
l
l
a
a
a
n
n
n
k
k
k
T
T
T
T
T
T
T
N
N
N
N
N
N
N
7
2
2
7
7
7
7
9
4
1
7
7
7
9
4
0
8
6
6
1
9
0
2
or
or
D
or
T
T
b
N
N
l
5
5
a
7
7
n
0
0
k
(BRG)
Service
631DB1
or
649A
B
B
B
l
l
l
a
a
a
n
n
n
k
k
k
Z
T
1
N
0
7
0
5
D
5
or
B
b
l
a
n
k
SI Installation and Upgrades
June 2004

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents