Test The System; Task List: Test The System - Avaya MCC1 Installation And Upgrades

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Test the System

This section provides tests to:
review the status of the system
test the tone-clock, TDM bus, and duplication link in the Processor Port Network (PPN)
test the expansion interfaces, tone-clock(s), TDM buses, and duplication in the Expansion Port
Networks (EPNs).
These tests verify the Time Division Multiplexing (TDM) cables, terminators, and the Inter-Cabinet
Cables (ICC). If a FAIL Result code is seen or other problems are indicated, check these cables. If
problems persist, refer to the Maintenance for Avaya DEFINITY® Server SI (555-233-123)
documentation.
See
LED Indicators
circuit packs.
NOTE:
Circuit pack positions are usually given by cabinet, carrier, and slot. They may also be
given by port. The term "cabinet" refers either to a stack of SCC1 (Single-Carrier
Cabinets) or to an MCC1 (Multi-Carrier Cabinet) making up one port network. A port
network is defined as a group of cabinets connected together with one TDM bus.

Task List: Test the System

CAUTION:
To prevent unnecessary trouble tickets, do not enable the system alarms (Alarm
Origination feature) until all installation and administration procedures are completed.
1
2
3
4
5
6
7
8
9
10
11
12
SI Installation and Upgrades
June 2004
on page 484 for information regarding the LED status indicators for the different
Task List: Test the System
on page 490
on page 492
on page 492
on page 494
on page 495
on page 495
Test the System
483

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents