Avaya MCC1 Installation And Upgrades page 233

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Save translations to tape [75 XE upgrade]
Return to Task List
As a safety precaution, create a backout tape:
1
Log into the DEFINITY switch.
2
Type
save translation
NOTE:
If the system uses the TN750C announcement circuit pack (which has onboard,
nonvolatile memory) you do not need to save announcements. Stop here.
3
If the system uses the TN750B or earlier announcement circuit pack, type
announcements
4
If administered recorded announcements are listed, type
press Enter.
5
Check page 2 of this form to see when the announcements were last saved, and ask the customer
whether any announcements have changed since then.
6
If announcements have changed, type
Return to Task List
Verify power and grounding and check for power transfer stations [75 XE upgrade]
Return to Task List
1
Verify the power and grounding and make any changes, if necessary.
2
Insert an isolator, if necessary.
3
Visually inspect for power transfer panels.
Return to Task List
Modify external alarm connections [75 XE upgrade]
Return to Task List
You modify the external alarm connections if necessary (that is, if they changed with this upgrade).
See the
Auxiliary lead appearances at AUX connector
and the
Auxiliary lead appearances for System 75, G1, and G3
The control carrier AUX connector outputs include:
Alarm monitoring for the auxiliary cabinet.
Seven -48 VDC power sources for emergency transfer units.
SI Installation and Upgrades
June 2004
and press Enter.
and press Enter.
save announcements
System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
list configuration software-version
and press Enter.
table for the current pinouts for an external alarm,
table for the prior pinouts.
display
and
233

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents